  • 2018
    • Garage renovation
      • Refaced ski lockers
      • Replaced old wood with hardie-board
      • Garage painting – walls and ceiling
      • New ceiling tiles in elevator landings
      • Cleaned and restriped garage floor
      • New ADA ramp at west elevator
      • Replaced lighting with LED
      • New signage
    • Installed LED lighting in elevators, laundry rooms, office, and maintenance shop
    • Motion sensors installed in laundry rooms and changing rooms
    • Renovated both laundry rooms
      • New flooring
      • Painted
      • Updated plumbing
      • New folding tables and garment racks
    • New carpeting in both elevators and garage level landings
    • New southeast irrigation
    • New pool furnace
    • New pool loungers, tables and umbrellas
    • New unit signage on each floor by west elevator
  • 2017
    • New carpeting in both elevators and garage level landings
    • Comcast Xfinity bulk account
    • New signage in garage
    • New gutters on east stone veneer
    • Snow clips above 113-116
    • New gutter and heat tape above 602-604 area
    • New south area garden
    • New lighting on the south sidewalk
    • New hot tub covers
    • Exterior stairwells were resurfaced
    • Interior stairwells lighting was replaced with LED lighting
    • New flower company – Dragonfly Gardening
    • New keyless entry hardware on all unit doors
  • 2016
    • Stone Veneer on East and South sides of Vantage Point-Vail
    • Renovated office
    • New bike racks that are removed during ski season to create more parking spaces
    • Three new luggage carts
    • Electric car charging station
    • Unit door hardware updating
    • Consistency throughout building
    • Security
    • Pool & hot tubs are up to code with safety equipment
    • Replaced fluorescent lighting with LED outside the unit doors
    • Stairwell lights are being replaced with LED lighting when they burn out
    • New signage for the office and west laundry door
    • Elevator signage is now up to code and new matts were installed
    • Stairwells were pressure washed
    • New drain and replacement of existing drains on 1st floor SE stairwell that were full of silt
    • New carpeting in both elevators and garage level landings
  • 2015
    • Installed new entrance sign
    • Installed pet station
    • Office remodeled
  • 2014
    • Painted exterior of building and railings
    • Resurfaced the decking
    • Refurbished both spas
    • Installed 9 new lamp post light fixtures throughout the properties
    • Replaced old timbers with a boulder retaining wall
    • Replaced all common door hardware with ADA compliant hardware
  • 2013
    • Phase I elevator replaced
  • 2012
    • Replaced all outdated smoke/heat detectors in all units that were older than 10 years
    • Installed speed bumps in garage
  • 2011
    • Phase II elevator upgraded and renovated
    • Building cable was rewired
    • Replaced concrete walkway ramp on the south side of building
    • Repaired concrete walkway “T”s in Phase II
    • Completed major repairs to east spa
  • 2010
    • Painted exterior building including garage and garage ceiling
    • Replaced garage lighting with new fixtures
    • Upgraded the fire alarm system with a new control panel and unit detectors
  • 2009
    • Installed carbon-monoxide detectors in all units
    • Repaired cracked walls in garage
    • Both laundry rooms flooring was replaced and hung ceilings installed
    • Replaced asphalt paving in the south side of garage
    • Constructed the dumpster enclosure room
  • 2008
    • Replaced 350 feet of gutters
    • Resealed and top coated three common deck areas
    • Repaired concrete in the garage
    • Insulated Phase II garage ceiling
  • 2007
    • Seal coated all three exterior stairwells
    • Renovated chimney stacks
    • Refurbished both elevators
  • 2006
    • Exterminated bat infestation
  • 2005
    • Repainted exterior of building
    • Installed new exterior railings
    • Re-carpeted all exterior walkways
    • New exterior lighting
  • 2004
    • Resealed and top coated 1st floor and walkway
    • Repaired Phase I garage floor
  • 2003
    • Replaced roof on building
    • Pool area was renovated
    • Re-carpeted office
  • 2002
    • Connected Phase I storm drain to the Town of Vail’s storm drain system
  • 1999
    • Plumbed building with natural gas for fireplaces and grills
    • Waterproofed exterior wall down to the footings in Phase II
  • 1998
    • Painted exterior of building
    • Waterproofed and top coated common deck
  • 1997
    • Re-carpeted Phase I walkways
  • 1996
    • Replaced entrance driveway
  • 1995
    • Re-carpeted Phase II walkways
  • 1994
    • Painted exterior of building
    • Replaced exit driveway
  • 1992
    • Repaired major leak in swimming pool
  • 1990
    • Painted exterior of building
    • Topcoat and re-sealed first floor deck and walkway
  • 1987
    • Installed enclosed stairwell emergency lighting
    • Major pool area renovation included two spas, new mechanical room and changing rooms and bather
  • 1986
    • Repaired deteriorating fascia board on walkways
  • 1985
    • Painted exterior of building
    • New signage for Vantage Point-Vail exterior
  • 1984
    • Installed fire alarm system in building for heat and smoke detection and pull boxes
  • 1981
    • Remodeled the storage area in garage from storage to office rental space
  • 1980
    • Installed new wood shake shingle roof
    • Installed lawn sprinkler system on property
  • 1979
    • Landscaped 80% of the property including trees, timber wall beds, sod, flower beds, etc.
    • Installed parking control system in garage with card operated tire eater

 